1 Commits

Author SHA1 Message Date
Johan Wikman
e33b2d0fcd MXS-1567 Rolling master promotion
- The test starts with the usual setup of 1 master and 3 slaves.
- Then the master is taken down and it is checked that the failover
  mechanism promotes some slave to master.
- This is continued until there is a single master left (no
  slaves).
2017-12-15 13:51:46 +02:00